2026 Bmw M4 Competition Xdrive
WBS33HK09TCW64356

Last known mileage — 1 605 mi.. This page includes photos, sale history, market estimate and similar BMW M4 listings.

Characteristics

Who sells
Users only
Seller Reserve Price
VIN WBS33HK09TCW64356
Auction IAAI
Mileage 1,605 mi 2,583 km
Auction Date (UTC) 08/10/2026 17:00
Engine 3.0l I-6 Di, Dohc, Vvt, Turbo, 523hp
Color Orange
Body Coupe
Transmission Automatic
Fuel Gasoline
Key Keys Present
Cost of repair $ 50 249 USD
Market value $ 94 768 USD
Primary damage Rear
Secondary damage Right Front

Trade history

Auction Date
Auction
Price
Status
This content is for registered users only

Exterior condition

2 damages · 2 zones
Damage map
1 2
1 Rear
Primary damage: Rear
2 Front right
Secondary damage: Right Front
AI Analysis
Get an opinion: ChatGPT Google AI

Photo analysis not started yet

AI will analyze photos and damage and prepare a conclusion

VIN Decoder WBS33HK09TCW64356
A B S Standard
Adaptive Cruise Control Optional
Airbag Location Curtain 1st and 2nd Rows
Airbag Location Front 1st Row (Driver and Passenger)
Airbag Location Knee 1st Row (Driver and Passenger)
Airbag Location Side 1st and 2nd Rows
Auto High Beam Standard
Auto Reverse System Standard
Blind Spot Intervention Optional
Blind Spot Monitor Standard
Body Class Coupe
C I B Standard
Daytime Running Light Standard
Displacement (L) 3
Displacement C C 3000
Displacement C I 183.0712322841
Doors 2
Drive Type AWD/All-Wheel Drive
Dynamic Brake Support Standard
E D R Standard
E S C Standard
Engine Cylinders 6
Engine H P 523
Forward Collision Warning Standard
Fuel Type Gasoline
Keyless Ignition Standard
Lane Centering Assistance Optional
Lane Departure Warning Standard
Lane Keep System Optional
Lower Beam Headlamp Light Source LED
Make BMW
Manufacturer BMW M GMBH
Model M4
Model Year 2026
Other Restraint System Info Seat Belt: All Positions, Pretensioner/Head Inflatable Restraint: Front, Pretensioner/Side Airbag/Head Inflatable Restraint: Rear Outboard Driver-side & Rear Outboard Passenger-side
Park Assist Standard
Pedestrian Automatic Emergency Braking Standard
Plant City DINGOLFING
Plant Country GERMANY
Pretensioner Yes
Rear Automatic Emergency Braking Standard
Rear Cross Traffic Alert Optional
Rear Visibility System Standard
Seat Belts All Manual
Series 4-Series
T P M S Direct
Traction Control Standard
Trim M4 xDrive Competition
V I N WBS33HK09TCW64356
Vehicle Descriptor WBS33HK0*TC
Vehicle Type PASSENGER CAR
Vehicle Valuation (USA) WBS33HK09TCW64356
At Recycler No
Auction Announcement Within45 Days No
Colors Red
Display Name BMW
Display Name Competition xDrive Coupe 2D
Display Name 2026
Display Name M4
Drivetrains AWD
Engines 6-Cyl, Twin Turbo, 3.0 Liter
Flood Damage No
Frame Damage No
Government Use No
Has Accidents No
Insurance Owned No
Livery Use No
Miles 131
Not Actual Mileage No
Options
Blind-Spot Detection System, Executive Pkg, Parking Assistance Pkg, Driving Assistance Professional Pkg, Hill Start Assist, Traction Control, Stability Control, ABS (4-Wheel), Alarm System, Keyless Entry, Push Button Start, Air Conditioning, Power Windows, Power Door Locks, Dynamic Cruise Control, Power Tailgate Release, Power Steering, Tilt & Telescoping Wheel, AM/FM/HD Radio, CD/MP3 (Single Disc), harman/kardon Surround Sound, SiriusXM Satellite, Navigation System, Bluetooth Wireless, BMW Remote Services, Park Assist, Park Distance Control F&R, Backup Camera, Surround View Camera, Dual Air Bags, Side Air Bags, Knee Air Bags, Lane Departure Warning System, Heated Seats, Dual Power Seats, Leather, Daytime Running Lights, LED Headlamps, Alloy Wheels
Original Owner Yes
Police Use No
Previously Canadian No
Report Date 2026-08-04
Salvage Yes
Taxi Use No
Title Brand No
Transmissions Automatic, 8-Spd Sport w/Steptronic
Used As Rental No
Vehicle Data WBS33HK09TCW64356
Vehicle
Make BMW
Model M4
Year 2026
Country US
Competition xDrive
Name Competition xDrive Coupe
Body style 2dr Car
Drivetrain All Wheel Drive
Doors 2
MSRP $91,500
Invoice $85,595
Supply & Demand (USA) WBS33HK09TCW64356
Vehicle
Make BMW
Model M4
Year 2026
Market Overview
Supply level Neutral
Demand level Neutral
Avg days to sell 39 days
DSO 58 days
Ingest date 2026-08-03
Listings (90d)
Sold 114
Active listings 73
Final price calculator Estimated value
Estimated value Current bid ($0)
1 Lot price
2 Auction fees
3 Trucking to port
$320
4
5 Service fee (~)
~$554
1 4 Subtotal

Selects the nearest US port based on vehicle location.

Customs clearance
1 4 Customs value
6
7
8 Customs agency
6 8 Total customs payments
1 8 Total customs payments
tune Additional services
Additional services
9
$0
10
$0
11
$0
12
$0

Checking a box adds the amount to the estimated total.

For informational purposes only.

My profile
logout Logout