2016 Bmw M4
WBS3R9C53GK336750

Average price: $ 13 497 USD View stats

2016 Bmw M4 VIN WBS3R9C53GK336750 is available at IAAI. Last known mileage — 93 482 mi. This page includes photos, sale history, market estimate and similar BMW M4 listings.

Analysis report

This 2016 BMW M4 was previously owned by two individuals in Maryland and features an extensive service history with 22 recorded maintenance events at dealerships including BMW of Towson and BMW of Bel Air. While the vehicle shows consistent mileage for its age, it was officially declared a total loss by an insurance company due to non-collision damage, resulting in a branded salvage title. Reviewing the full report is essential before buying, bidding on, or financing this vehicle to understand the specific details regarding the salvage status and how previous structural assessments may impact current value.

Characteristics

Seller Reserve Price
VIN WBS3R9C53GK336750
Auction IAAI
Mileage 93,482 mi 150,444 km
Auction Date (UTC) 08/03/2026 13:30
Engine 3.0l I-6 Di, Dohc, Vvt, Turbo, 425hp
Color Black
Body Coupe
Transmission Automatic
Fuel Gasoline
Key Keys Present
Cost of repair $ 24 015 USD
Market value $ 31 941 USD
Primary damage Right Front

Trade history

Sales history unknown

Exterior condition

1 damage · 1 zone
Damage map
1
1 Front right
Primary damage: Right Front
AI Analysis
Get an opinion: ChatGPT Google AI
Expert Conclusion 6/10
Repair Complexity: High
Risk of Hidden Damage: High

Repair will require replacing the front bumper, right fender, and likely both headlights. The primary concern is whether the core support and radiator mounts are twisted, which could affect cooling efficiency or engine alignment.

Advantages
Insuranceer seller provides a high level of confidence in the documentation and title status.
Vehicle is an M-powered BMW with premium interior features.
Mileage (93k) is moderate for this specific powertrain.
Disadvantages
Front-end impact on a high-performance vehicle can lead to complex alignment issues or cooling system failures.
The severity of the hood deformation suggests significant force was involved in the collision.
Good for Parts

While the car is an attractive model from a reputable source (Insurance), the high repair cost relative to market value and the complexity of fixing structural front-end components on this specific chassis make it a riskier investment. It is best suited for a buyer who can perform their own repairs or has access to low-cost labor.

Airbags: Not Visible Glass: Intact Suspension damage
Damage
Moderate Front Right Bumper & Fender — Significant impact on the front right corner. The fender is buckled and pushed inward, and the bumper cover is torn/detached.
Severe Hood — The hood shows significant deformation and buckling due to the front-end impact. It may require replacement or extensive structural straightening.
Moderate Front Right Headlight Assembly — The headlight housing is pushed back and likely has internal mounting bracket damage. Replacement is probable.
Severe Engine Bay / Cooling System — Close proximity of the impact to the radiator and cooling fans suggests potential damage to these critical components. The mounting points for the front core support may be compromised.
Generated by Artificial Intelligence for reference
VIN Decoder WBS3R9C53GK336750
Airbag Location Curtain 1st and 2nd Rows
Airbag Location Front 1st Row (Driver and Passenger)
Airbag Location Knee 1st Row (Driver and Passenger)
Airbag Location Side 1st Row (Driver and Passenger)
Body Class Coupe
Displacement (L) 3
Displacement C C 3000
Displacement C I 181.8
Doors 2
Engine Cylinders 6
Engine H P 425
Fuel Type Gasoline
G V W R Class 1: 6,000 lb or less (2,722 kg or less)
G V W R_to Class 1: 6,000 lb or less (2,722 kg or less)
Make BMW
Manufacturer BMW M GMBH
Model M4
Model Year 2016
Other Restraint System Info Pretensioners for Driver and Front Passenger.
Plant City MUNICH
Plant Country GERMANY
Pretensioner Yes
Seat Belts All Manual
Series 4-Series
T P M S Direct
V I N WBS3R9C53GK336750
Vehicle Descriptor WBS3R9C5*GK
Vehicle Type PASSENGER CAR
Vehicle Valuation (USA) WBS3R9C53GK336750
At Recycler No
Auction Announcement Within45 Days No
Colors Blue
Display Name BMW
Display Name Coupe 2D
Display Name 2016
Display Name M4
Drivetrains RWD
Engines 6-Cyl, Twin Turbo, 3.0 Liter
Flood Damage No
Frame Damage No
Government Use No
Has Accidents No
Insurance Owned No
Livery Use No
Miles 85988
Not Actual Mileage No
Options
Executive Pkg, Traction Control, Dynamic Stability Control, ABS (4-Wheel), Alarm System, Keyless Entry, Keyless Start, Air Conditioning, Power Windows, Power Door Locks, Dynamic Cruise Control, Power Steering, Tilt & Telescoping Wheel, Head-Up Display, AM/FM Stereo, CD/MP3 (Single Disc), harman/kardon Sound, SiriusXM Satellite, Navigation System, Bluetooth Wireless, Park Distance Control, Backup Camera, Dual Air Bags, Side Air Bags, Heated Seats, Dual Power Seats, Leather, Moon Roof, Xenon Headlamps, Daytime Running Lights, LED Headlamps, Premium Wheels
Original Owner No
Police Use No
Previously Canadian No
Report Date 2026-07-25
Salvage No
Taxi Use No
Title Brand No
Transmissions Auto, 7-Spd Drive Logic
Used As Rental No
Vehicle Data WBS3R9C53GK336750
Vehicle
Make BMW
Model M4
Year 2016
Country US
2dr Coupe
Name 2dr Coupe
Body style 2dr Car
Drivetrain Rear Wheel Drive
Doors 2
MSRP $65,700
Invoice $60,945
Supply & Demand (USA) WBS3R9C53GK336750
Vehicle
Make BMW
Model M4
Year 2016
Market Overview
Supply level Neutral
Demand level Low
Avg days to sell 50 days
DSO 49 days
Ingest date 2026-07-20
Listings (90d)
Sold 134
Active listings 73
Final price calculator Estimated value
Estimated value Current bid ($0)
1 Lot price
2 Auction fees
3 Trucking to port
$320
4
5 Service fee (~)
~$554
1 4 Subtotal

Selects the nearest US port based on vehicle location.

Customs clearance
1 4 Customs value
6
7
8 Customs agency
6 8 Total customs payments
1 8 Total customs payments
tune Additional services
Additional services
9
$0
10
$0
11
$0
12
$0

Checking a box adds the amount to the estimated total.

For informational purposes only.

My profile
logout Logout