2026 Bmw M5
WBS83FK07TCV57980

Lot sold Winning bet: $72 250 USD Sales records: 1

2026 Bmw M5 VIN WBS83FK07TCV57980 was sold at IAAI for $72 250 USD. Last known mileage — 7 011 mi. This page includes photos, sale history, market estimate and similar BMW M5 listings.

Characteristics

VIN WBS83FK07TCV57980
Auction IAAI
Mileage 7,011 mi 11,283 km
Auction Date (UTC) 08/17/2026 17:00
Engine 4.4l V-8 Di, Dohc, Vvt, Turbo, 577hp
Color Green
Body Sedan
Transmission Automatic
Fuel Other
Key Keys Present
Cost of repair $ 78 454 USD
Market value $ 127 627 USD
Primary damage Left & Right Side
Secondary damage Undercarriage

Trade history

Auction Date
Auction
Price
Status
This content is for registered users only

Exterior condition

2 damages · 2 zones
Damage map
1 2
1 Right side
Primary damage: Left & Right Side
2 Other
Secondary damage: Undercarriage
AI Analysis
Get an opinion: ChatGPT Google AI

Photo analysis not started yet

AI will analyze photos and damage and prepare a conclusion

VIN Decoder WBS83FK07TCV57980
A B S Standard
Adaptive Cruise Control Optional
Airbag Location Curtain 1st and 2nd Rows
Airbag Location Front 1st Row (Driver and Passenger)
Airbag Location Knee 1st Row (Driver and Passenger)
Airbag Location Side 1st Row (Driver and Passenger)
Auto High Beam Standard
Auto Reverse System Standard
Blind Spot Intervention Standard
Blind Spot Monitor Standard
Body Class Sedan/Saloon
C I B Standard
Daytime Running Light Standard
Displacement (L) 4.4
Displacement C C 4400.0
Displacement C I 268.50447401682
Doors 4
Dynamic Brake Support Standard
E D R Standard
E S C Standard
Electrification Level PHEV (Plug-in Hybrid Electric Vehicle)
Engine Cylinders 8
Engine H P 717
Forward Collision Warning Standard
Fuel Type Electric
Fuel Type Secondary Gasoline
Keyless Ignition Standard
Lane Centering Assistance Standard
Lane Departure Warning Standard
Lane Keep System Standard
Lower Beam Headlamp Light Source LED
Make BMW
Manufacturer BMW M GMBH
Model M5
Model Year 2026
Other Restraint System Info Seat Belt: All Positions, Pretensioner/Head Inflatable Restraint: Front, Pretensioner/Head Inflatable Restraint: Rear Outboard Driver-side & Rear Outboard Passenger-side
Park Assist Standard
Pedestrian Automatic Emergency Braking Standard
Plant City DINGOLFING
Plant Country GERMANY
Pretensioner Yes
Rear Automatic Emergency Braking Standard
Rear Cross Traffic Alert Standard
Rear Visibility System Standard
Seat Belts All Manual
Series 5-Series
T P M S Direct
Traction Control Standard
V I N WBS83FK07TCV57980
Vehicle Descriptor WBS83FK0*TC
Vehicle Type PASSENGER CAR
Vehicle Valuation (USA) WBS83FK07TCV57980
At Recycler No
Auction Announcement Within45 Days No
Colors Green
Display Name BMW
Display Name Sedan 4D
Display Name 2026
Display Name M5
Drivetrains AWD
Engines V8, Hybrid, Twin Turbo, 4.4 Liter
Flood Damage No
Frame Damage No
Government Use No
Has Accidents No
Insurance Owned No
Livery Use No
Miles 7011
Not Actual Mileage No
Options
Blind-Spot Detection, Driving Assistance Professional Pkg, Executive Pkg, Dynamic Stability Control, ABS (4-Wheel), Alarm System, Keyless Entry, Push Button Start, Air Conditioning, Air Conditioning, Rear, Power Windows, Power Door Locks, Power Tailgate Release, Power Steering, Tilt & Telescoping Wheel, Head-Up Display, AM/FM Stereo, Bowers & Wilkins Diamond Surround Sound, SiriusXM Satellite, Navigation System, Parking Assistant, F&R Parking Sensors, Backup Camera, Dual Air Bags, Side Air Bags, F&R Head Curtain Air Bags, Lane Departure Warning System, Heated Seats, Ventilated Seats, Dual Power Seats, Leather, Panorama Roof, Daytime Running Lights, LED Headlamps, Premium Wheels
Original Owner Yes
Police Use No
Previously Canadian No
Report Date 2026-08-13
Salvage Yes
Taxi Use No
Title Brand Yes
Transmissions Automatic, 8-Spd Sport w/Steptronic, Sport & Manual Modes
Used As Rental No
Market Price Analysis (USA) WBS83FK07TCV57980
Vehicle
Make B M W
Model M SERIES
Trim M5 4D SEDAN
Year 2026
Color Green
Odometer 7,011 mi
Typical Listing Price
Adjusted average $121,000
Base value $121,000
Avg odometer 5,549 mi
Color adjustment $880
Odometer adjustment $-760
Weekly depreciation $253
Private seller price $113,050
Fair Purchase Price
Adjusted average $114,000
Base value $114,000
Avg odometer 5,549 mi
Color adjustment $830
Odometer adjustment $-720
Weekly depreciation $253
90 Days Sold
Price low $109,829
Price high $125,307
Mileage low 1,329 mi
Mileage high 10,291 mi
Active Listings
Price low $108,739
Price high $130,304
Mileage low 1,261 mi
Mileage high 13,695 mi
Days to sell 0 days
Fair market purchase price — $114,000.
Vehicle Data WBS83FK07TCV57980
Vehicle
Make BMW
Model M5
Year 2026
Country US
Sedan
Name Sedan
Body style 4dr Car
Drivetrain All Wheel Drive
Doors 4
MSRP $123,300
Invoice $115,170
Supply & Demand (USA) WBS83FK07TCV57980
Vehicle
Make BMW
Model M5
Year 2026
Market Overview
Supply level High
Demand level Low
Avg days to sell 58 days
DSO 81 days
Ingest date 2026-08-10
Listings (90d)
Sold 120
Active listings 108
Final price calculator Estimated value
Estimated value Current bid ($0)
1 Lot price
2 Auction fees
3 Trucking to port
$320
4
5 Service fee (~)
~$554
1 4 Subtotal

Selects the nearest US port based on vehicle location.

Customs clearance
1 4 Customs value
6
7
8 Customs agency
6 8 Total customs payments
1 8 Total customs payments
tune Additional services
Additional services
9
$0
10
$0
11
$0
12
$0

Checking a box adds the amount to the estimated total.

For informational purposes only.

My profile
logout Logout