2016 Bmw M3
WBS8M9C5XG5E68622

Average price: $ 18 040 USD View stats

2016 Bmw M3 VIN WBS8M9C5XG5E68622 is available at Copart. Last known mileage — 96 213 mi.. This page includes photos, sale history, market estimate and similar BMW M3 listings.

Characteristics

Who sells
Users only
VIN WBS8M9C5XG5E68622
Auction Copart
Mileage 96,213 mi 154,839 km
Auction Date (UTC) 08/14/2026 14:00
Engine 3.0l 6
Color Black
Transmission Automatic
Fuel GAS
Drive REAR WHEEL DRIVE
Key Keys Present
Cost of repair $ 17 830 USD
Market value $ 33 285 USD
Primary damage Front End

Trade history

Sales history unknown

Exterior condition

1 damage · 1 zone
Damage map
1
1 Front
Primary damage: FRONT END
AI Analysis
Get an opinion: ChatGPT Google AI

Photo analysis not started yet

AI will analyze photos and damage and prepare a conclusion

VIN Decoder WBS8M9C5XG5E68622
Airbag Location Curtain 1st and 2nd Rows
Airbag Location Front 1st Row (Driver and Passenger)
Airbag Location Knee 1st Row (Driver and Passenger)
Airbag Location Side 1st Row (Driver and Passenger)
Body Class Sedan/Saloon
Displacement (L) 3
Displacement C C 3000
Displacement C I 181.8
Doors 4
Engine Cylinders 6
Engine H P 425
Fuel Type Gasoline
G V W R Class 1: 6,000 lb or less (2,722 kg or less)
G V W R_to Class 1: 6,000 lb or less (2,722 kg or less)
Make BMW
Manufacturer BMW M GMBH
Model M3
Model Year 2016
Other Restraint System Info Pretensioners for Driver and Front Passenger.
Plant City REGENSBURG
Plant Country GERMANY
Pretensioner Yes
Seat Belts All Manual
T P M S Direct
V I N WBS8M9C5XG5E68622
Vehicle Descriptor WBS8M9C5*G5
Vehicle Type PASSENGER CAR
Vehicle Valuation (USA) WBS8M9C5XG5E68622
At Recycler No
Auction Announcement Within45 Days No
Colors Blue
Display Name BMW
Display Name Sedan 4D
Display Name 2016
Display Name M3
Drivetrains RWD
Engines 6-Cyl, Twin Turbo, 3.0 Liter
Flood Damage No
Frame Damage No
Government Use No
Has Accidents Yes
Insurance Owned Yes
Livery Use No
Miles 77899
Not Actual Mileage No
Options
Blind-Spot Alert, Driver Assistance Pkg, Executive Pkg, Competition Pkg, Traction Control, Dynamic Stability Control, ABS (4-Wheel), Anti-Theft System, Keyless Entry, Keyless Start, Air Conditioning, Power Windows, Power Door Locks, Dynamic Cruise Control, Power Steering, Tilt & Telescoping Wheel, Head-Up Display, AM/FM Stereo, CD/MP3 (Single Disc), harman/kardon Sound, SiriusXM Satellite, Navigation System, Bluetooth Wireless, BMW Assist, Parking Sensors, Backup Camera, Multi-View Camera, Dual Air Bags, Side Air Bags, Knee Air Bags, Heated Seats, Dual Power Seats, Leather, Moon Roof, Xenon Headlamps, Daytime Running Lights, LED Headlamps, Rear Spoiler, Premium Wheels
Original Owner No
Police Use No
Previously Canadian No
Report Date 2026-08-09
Salvage Yes
Taxi Use No
Title Brand No
Transmissions Auto 7Spd DblCltch DrvLgc
Used As Rental No
Market Price Analysis (USA) WBS8M9C5XG5E68622
Vehicle
Make B M W
Model M SERIES
Trim M3 4D SEDAN
Year 2016
Color Black
Odometer 96,213 mi
Typical Listing Price
Adjusted average $38,400
Base value $43,800
Avg odometer 77,670 mi
Color adjustment $-60
Odometer adjustment $-4,450
Weekly depreciation $-72
Private seller price $33,900
Fair Purchase Price
Adjusted average $36,200
Base value $41,100
Avg odometer 77,670 mi
Color adjustment $-60
Odometer adjustment $-4,090
Weekly depreciation $-73
90 Days Sold
Price low $33,970
Price high $55,194
Mileage low 40,455 mi
Mileage high 108,260 mi
Active Listings
Price low $34,995
Price high $52,817
Mileage low 47,677 mi
Mileage high 114,573 mi
Days to sell 0 days
Fair market purchase price — $36,200. Mileage is above the market average (77,670 mi).
Vehicle Data WBS8M9C5XG5E68622
Vehicle
Make BMW
Model M3
Year 2016
Country US
4dr Sedan
Name 4dr Sedan
Body style 4dr Car
Drivetrain Rear Wheel Drive
Doors 4
MSRP $63,500
Invoice $58,920
Supply & Demand (USA) WBS8M9C5XG5E68622
Vehicle
Make BMW
Model M3
Year 2016
Market Overview
Supply level Neutral
Demand level Neutral
Avg days to sell 36 days
DSO 54 days
Ingest date 2026-08-03
Listings (90d)
Sold 60
Active listings 36
Final price calculator Estimated value
Estimated value Current bid ($11,600)
1 Lot price
2 Auction fees
3 Trucking to port FL · FL - TAMPA NORTH
$320
4
5 Service fee (~)
~$554
1 4 Subtotal

Selects the nearest US port based on vehicle location.

Customs clearance
1 4 Customs value
6
7
8 Customs agency
6 8 Total customs payments
1 8 Total customs payments
tune Additional services
Additional services
9
$0
10
$0
11
$0
12
$0

Checking a box adds the amount to the estimated total.

For informational purposes only.

My profile
logout Logout