2026 Bmw M5 Touring
WBS83GV07TCW00246 history Trade history

Last known mileage — 3 648 mi.. This page includes photos, sale history, market estimate and similar BMW M5 listings.

Characteristics

Who sells
Users only
Seller Reserve Price
VIN WBS83GV07TCW00246
Auction IAAI
Mileage 3,648 mi 5,871 km
Auction Date (UTC) 06/22/2026 17:00
Engine 4.4l V-8 Di, Dohc, Vvt, Turbo, 577hp
Color Gray
Body Wagon
Transmission Automatic
Fuel Other
Key Keys Present
Cost of repair $ 0 USD
Market value $ 127 570 USD
Primary damage Rear
Secondary damage Front End

Trade history

Auction Date
Auction
Price
Status
This content is for registered users only

Exterior condition

2 damages · 2 zones
Damage map
1 2
1 Rear
Primary damage: Rear
2 Front
Secondary damage: Front End
AI Analysis
Get an opinion: ChatGPT Google AI

Photo analysis not started yet

AI will analyze photos and damage and prepare a conclusion

VIN Decoder WBS83GV07TCW00246
A B S Standard
Adaptive Cruise Control Optional
Airbag Location Curtain 1st and 2nd Rows
Airbag Location Front 1st Row (Driver and Passenger)
Airbag Location Knee 1st Row (Driver and Passenger)
Airbag Location Side 1st Row (Driver and Passenger)
Auto High Beam Standard
Auto Reverse System Standard
Blind Spot Intervention Standard
Blind Spot Monitor Standard
Body Class Wagon
C I B Standard
Daytime Running Light Standard
Displacement (L) 4.4
Displacement C C 4400.0
Displacement C I 268.50447401682
Doors 4
Dynamic Brake Support Standard
E D R Standard
E S C Standard
Electrification Level PHEV (Plug-in Hybrid Electric Vehicle)
Engine Cylinders 8
Engine H P 717
Forward Collision Warning Standard
Fuel Type Electric
Fuel Type Secondary Gasoline
Keyless Ignition Standard
Lane Centering Assistance Standard
Lane Departure Warning Standard
Lane Keep System Standard
Lower Beam Headlamp Light Source LED
Make BMW
Manufacturer BMW M GMBH
Model M5
Model Year 2026
Other Restraint System Info Seat Belt: All Positions, Pretensioner/Head Inflatable Restraint: Front, Pretensioner/Head Inflatable Restraint: Rear Outboard Driver-side & Rear Outboard Passenger-side
Park Assist Standard
Pedestrian Automatic Emergency Braking Standard
Plant City DINGOLFING
Plant Country GERMANY
Pretensioner Yes
Rear Automatic Emergency Braking Standard
Rear Cross Traffic Alert Standard
Rear Visibility System Standard
Seat Belts All Manual
Series 5-Series
T P M S Direct
Traction Control Standard
Trim Touring
V I N WBS83GV07TCW00246
Vehicle Descriptor WBS83GV0*TC
Vehicle Type PASSENGER CAR
Vehicle Valuation (USA) WBS83GV07TCW00246
At Recycler No
Auction Announcement Within45 Days No
Colors Silver
Display Name BMW
Display Name Touring Wagon 4D
Display Name 2026
Display Name M5
Drivetrains AWD
Engines V8, Hybrid, Twin Turbo, 4.4 Liter
Flood Damage No
Frame Damage No
Government Use No
Has Accidents Yes
Insurance Owned Yes
Livery Use No
Miles 3648
Not Actual Mileage No
Options
Driving Assistance Professional Pkg, Executive Pkg, Blind-Spot Detection, Dynamic Stability Control, ABS (4-Wheel), Alarm System, Keyless Entry, Push Button Start, Air Conditioning, Air Conditioning, Rear, Power Windows, Power Door Locks, Power Tailgate Release, Power Steering, Tilt & Telescoping Wheel, Head-Up Display, AM/FM Stereo, Bowers & Wilkins Diamond Surround Sound, SiriusXM Satellite, Navigation System, Parking Assistant, F&R Parking Sensors, Backup Camera, Dual Air Bags, Side Air Bags, F&R Head Curtain Air Bags, Lane Departure Warning System, Heated Seats, Ventilated Seats, Dual Power Seats, Leather, Panorama Roof, Daytime Running Lights, LED Headlamps, Rear Spoiler, Premium Wheels
Original Owner Yes
Police Use No
Previously Canadian No
Report Date 2026-06-13
Salvage Yes
Taxi Use No
Title Brand Yes
Transmissions Automatic, 8-Spd Sport w/Steptronic, Sport & Manual Modes
Used As Rental No
Market Price Analysis (USA) WBS83GV07TCW00246
Vehicle
Make B M W
Model M SERIES
Trim M5 4D WAGON
Year 2026
Color Gray
Odometer 3,648 mi
Typical Listing Price
Adjusted average $133,000
Base value $133,000
Avg odometer 1,556 mi
Color adjustment $320
Odometer adjustment $-710
Weekly depreciation $0
Private seller price $123,200
Fair Purchase Price
Adjusted average $133,000
Base value $133,000
Avg odometer 1,556 mi
Color adjustment $320
Odometer adjustment $-710
Weekly depreciation $0
90 Days Sold
Price low $127,091
Price high $139,849
Mileage low 582 mi
Mileage high 6,085 mi
Active Listings
Price low $125,043
Price high $134,318
Mileage low 1,201 mi
Mileage high 6,852 mi
Days to sell 0 days
Fair market purchase price — $133,000. Mileage is above the market average (1,556 mi).
Vehicle Data WBS83GV07TCW00246
Vehicle
Make BMW
Model M5
Year 2026
Country US
Touring
Name Touring
Body style 4dr Car
Drivetrain All Wheel Drive
Doors 4
MSRP $125,300
Invoice $117,030
Supply & Demand (USA) WBS83GV07TCW00246
Vehicle
Make BMW
Model M5
Year 2026
Market Overview
Supply level High
Demand level Low
Avg days to sell 53 days
DSO 73 days
Ingest date 2026-06-08
Listings (90d)
Sold 92
Active listings 75
Final price calculator Estimated value
Estimated value Current bid ($0) Buy It Now ($65,000)
1 Lot price
2 Auction fees
3 Trucking to port
$320
4
5 Service fee (~)
~$554
1 4 Subtotal

Selects the nearest US port based on vehicle location.

Customs clearance
1 4 Customs value
6
7
8 Customs agency
6 8 Total customs payments
1 8 Total customs payments
tune Additional services
Additional services
9
$0
10
$0
11
$0
12
$0

Checking a box adds the amount to the estimated total.

For informational purposes only.

My profile
logout Logout